Cell Site Map

Cell towers in Golbey (Vosges)

Golbey has 7 masts declared to ANFR, used by 4 carriers. The tallest stands 36 m at 1 A Ruerue de l'Ecluse.

Nearest sites

OperatorGenerationDistanceBearingSource
Orange5G / 4G / 3G · 3 sectors579 m214° SWVerified
Free Mobile5G / 4G · 3 sectors579 m214° SWVerified
SFR5G / 4G / 3G · 3 sectors1.2 km263° WVerified
Bouygues Telecom5G / 4G / 3G · 3 sectors1.2 km263° WVerified
Orange5G / 4G / 3G · 3 sectors1.2 km265° WVerified
Free Mobile5G / 4G · 3 sectors1.2 km265° WVerified
Orange5G / 4G / 3G · 3 sectors1.3 km161° SVerified
Orange5G / 4G / 3G · 3 sectors1.4 km185° SVerified
SFR5G / 4G / 3G / 2G · 3 sectors1.6 km354° NVerified
Orange5G / 4G · 3 sectors1.6 km354° NVerified

Map

Free MobileOrangeBouygues TelecomSFRVerifiedEstimated

Carrier breakdown

OperatorSitesShare
Free Mobile457.1%
Orange457.1%
Bouygues Telecom342.9%
SFR342.9%

Place names on the register include 13 rue de Xay, Le Haut Gras, 21 Rue de la Louvroie, 1 A Ruerue de l'Ecluse, Le Haut du Gras and 9 rue des Chaudronniers.

The tallest structure is a 36 m pylon at 1 A Ruerue de l'Ecluse. The median is 23 m, slightly below the Vosges median of 28 m.

2015 was the busiest year, with 17 new systems, most of them 4G. Free Mobile opened 5G here in December 2020; Orange followed in December 2022, SFR followed in October 2024. The oldest transmitter still listed here goes back to 2001.

20 systems were switched on in the past 12 months. Approved additions not yet in service are pending on 2 existing masts, for example Free Mobile (5G 700 MHz) at 21 Rue de la Louvroie and Orange (5G, including 5G at 3.5 GHz) at Le Haut Gras. 5 Bouygues Telecom 5G transmitters are listed as technically operational — installed, but not yet declared commercially in service.

3.5 GHz 5G is declared by Orange on 3 of its 4 masts, Bouygues Telecom on 2 of its 3 masts, Free Mobile on 2 of its 4 masts and SFR on 2 of its 3 masts.

Supports leave a gap of about 2 km to the north-west of the centre.

22 km to the north-east, neighbouring Rambervillers has a water tower among its supports.

Of the 7 masts in the commune, only one mast carries all four networks.

Supports split between 4 pylons and 3 buildings.

Source: operator declarations to ANFR, as of October 2026. Projects that are only approved are left out of the totals.

Frequently asked questions

Where is the tallest mast in Golbey?
The tallest declared support is 36 m at 1 A Ruerue de l'Ecluse (pylon).
When did 5G arrive in Golbey?
Free Mobile declared the first 5G in December 2020, Orange in December 2022.
Are new antennas planned in Golbey?
No new site is approved at the moment. Approved additions not yet in service are pending on 2 existing masts, for example Free Mobile (5G 700 MHz) at 21 Rue de la Louvroie and Orange (5G, including 5G at 3.5 GHz) at Le Haut Gras.
Is fast 5G declared in Golbey?
3.5 GHz 5G is declared by Orange on 3 of its 4 masts, Bouygues Telecom on 2 of its 3 masts, Free Mobile on 2 of its 4 masts and SFR on 2 of its 3 masts. Band details in the 5G-by-carrier guide.
Which carrier has the most sites of its own in Golbey?
Orange is on its own at 1 location.

Nearby places

Useful guides

Data source: ANFR — Licence Ouverte 2.0. See all sources.