Cell Site Map

Cell towers in Champigneulles

4 carriers share the 7 masts that ANFR lists in Champigneulles. They include 1 bridge or viaduct.

Nearest sites

OperatorGenerationDistanceBearingSource
SFR5G / 4G / 3G · 3 sectors313 m33° NEVerified
Orange5G / 4G · 3 sectors344 m312° NWVerified
Orange5G / 4G · 2 sectors489 m191° SVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors737 m50° NEVerified
SFR5G / 4G / 3G / 2G · 3 sectors737 m50° NEVerified
Orange5G / 4G / 3G · 2 sectors737 m50° NEVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors830 m156° SEVerified
Free Mobile5G / 4G · 3 sectors830 m156° SEVerified
SFR4G / 3G / 2G · 3 sectors830 m156° SEVerified
Free Mobile5G / 4G · 3 sectors905 m40° NEVerified

Map

Bouygues TelecomOrangeSFRFree MobileVerifiedEstimated

Carrier breakdown

OperatorSitesShare
Bouygues Telecom342.9%
Orange342.9%
SFR342.9%
Free Mobile342.9%

Declared supports include 1 bridge or viaduct, with pylons making up most of the remainder.

Antennas are listed at Rue Frédéric Chopin / Rue Philippe Martin, Les Fonds de Toul, Les Sables, rue de Brest, 34 Bisrue de Frouard and 2 rue Gabriel Bourg.

ANFR has approved one new site that is not live yet, plus additions on 2 existing masts. New: Bouygues Telecom (4G and 5G) at 15 rue Charles Martel. 6 Bouygues Telecom 5G transmitters are listed as technically operational — installed, but not yet declared commercially in service.

Systems from 2001 are still on the register. Local 5G started with Bouygues Telecom in November 2020; Free Mobile followed in December 2021, SFR followed in December 2021. 2021 was the busiest year, with 16 new systems, most of them 4G.

The tallest structure is a 70 m building at 2 rue Gabriel Bourg. The median is 27 m, slightly below the Meurthe-et-Moselle median of 30 m.

The widest declared gap between neighbouring supports is about 6.1 km, to the south-west of the centre. Most declared azimuths point outward, along a corridor or valley rather than at the centre.

On 3.5 GHz, the fastest 5G band: Bouygues Telecom on all 3 masts, Orange on 2 of its 3 masts, SFR on 2 of its 3 masts and Free Mobile on 1 of its 3 masts.

Maxeville lies 2.3 km to the south and has a church or religious building among its supports.

Colocation covers 3 supports.

Figures above cover installations declared to ANFR as in service or technically operational, as of October 2026; approved projects are not counted.

Frequently asked questions

What do the masts in Champigneulles stand on?
Declared supports include 1 bridge or viaduct, with pylons making up most of the remainder.
Are new antennas planned in Champigneulles?
ANFR has approved one new site that is not live yet, plus additions on 2 existing masts. New: Bouygues Telecom (4G and 5G) at 15 rue Charles Martel.
When did 5G arrive in Champigneulles?
Bouygues Telecom declared the first 5G in November 2020, Free Mobile in December 2021.
Where is the tallest mast in Champigneulles?
The tallest declared support is 70 m at 2 rue Gabriel Bourg (building).
Is fast 5G declared in Champigneulles?
3.5 GHz 5G is declared by Bouygues Telecom on all 3 masts, Orange on 2 of its 3 masts, SFR on 2 of its 3 masts and Free Mobile on 1 of its 3 masts. Band details in the 5G-by-carrier guide.

Nearby places

Useful guides

Data source: ANFR — Licence Ouverte 2.0. See all sources.