Cell Site Map

Cell towers in Maxeville (Meurthe-et-Moselle)

Maxeville has 9 masts declared to ANFR, used by 4 carriers. They include 1 church or religious building.

Nearest sites

OperatorGenerationDistanceBearingSource
Orange5G / 4G / 3G · 3 sectors381 m237° SWVerified
SFR5G / 4G / 3G / 2G · 2 sectors381 m237° SWVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors604 m332° NWVerified
Free Mobile5G / 4G · 2 sectors718 m344° NVerified
SFR5G / 4G · 3 sectors858 m18° NVerified
SFR5G / 4G / 3G / 2G · 1 sectors905 m306° NWVerified
Orange5G / 4G / 3G · 3 sectors989 m93° EVerified
SFR5G / 4G / 3G / 2G · 3 sectors1.1 km159° SVerified
Free Mobile5G / 4G · 3 sectors1.1 km159° SVerified
Orange5G / 4G · 3 sectors1.1 km159° SVerified

Map

SFROrangeFree MobileBouygues TelecomVerifiedEstimated

Carrier breakdown

OperatorSitesShare
SFR444.4%
Orange333.3%
Free Mobile333.3%
Bouygues Telecom333.3%

1 church or religious building and 4 buildings and 4 pylons carry the commune's antennas.

Antennas are listed at avenue du Général de Gaulle, Les Carrières, avenue du Général Patton, 143 Bisrue Gambetta Prolongee, Rue des Haut des Vignes and 10-16 Rue du Rabodeau.

Over the past 12 months ANFR recorded 8 new systems here. ANFR has approved one new site that is not live yet, plus additions on 2 existing masts. New: Bouygues Telecom (4G and 5G) at 4 Rue Jean Jaurès. 4 Bouygues Telecom 5G transmitters are listed as technically operational — installed, but not yet declared commercially in service.

ANFR lists a 48 m pylon at Les Carrières as the tallest structure. The median height of measured supports is 32 m.

Systems from 2009 are still on the register. Bouygues Telecom switched on the first 5G here in November 2020; Free Mobile followed in December 2020, Orange followed in March 2021. 2019 was the busiest year, with 20 new systems, most of them 4G.

3 supports carry only SFR.

On 3.5 GHz, the fastest 5G band: SFR on all 4 masts, Orange on all 3 masts, Bouygues Telecom on 2 of its 3 masts and Free Mobile on 2 of its 3 masts.

Malzeville lies 1.3 km to the east and has 8 masts declared.

Figures above cover installations declared to ANFR as in service or technically operational, as of October 2026; approved projects are not counted.

Frequently asked questions

What do the masts in Maxeville stand on?
1 church or religious building and 4 buildings and 4 pylons carry the commune's antennas.
Are new antennas planned in Maxeville?
ANFR has approved one new site that is not live yet, plus additions on 2 existing masts. New: Bouygues Telecom (4G and 5G) at 4 Rue Jean Jaurès.
Where is the tallest mast in Maxeville?
The tallest declared support is 48 m at Les Carrières (pylon).
When did 5G arrive in Maxeville?
Bouygues Telecom declared the first 5G in November 2020, Free Mobile in December 2020.
Which carrier has the most sites of its own in Maxeville?
SFR is on its own at 3 locations.

Nearby places

Useful guides

Data source: ANFR — Licence Ouverte 2.0. See all sources.