Cell Site Map

Cell towers in La Creche (Deux-Sèvres)

ANFR lists 5 masts in La Creche, shared between 4 carriers. ANFR has also approved one new site that is not live yet.

Nearest sites

OperatorGenerationDistanceBearingSource
Orange5G / 4G / 3G / 2G · 3 sectors754 m149° SEVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors754 m149° SEVerified
SFR5G / 4G / 3G / 2G · 3 sectors754 m149° SEVerified
SFR5G / 4G / 3G / 2G · 3 sectors2.3 km203° SWVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors2.3 km203° SWVerified
Free Mobile5G / 4G · 3 sectors2.3 km203° SWVerified
Orange5G / 4G / 3G · 3 sectors2.3 km203° SWVerified
Orange5G / 4G · 3 sectors2.3 km327° NWVerified
Orange5G / 4G · 3 sectors3.1 km69° EVerified
Orange5G / 4G / 3G / 2G · 3 sectors3.2 km152° SEVerified

Map

OrangeBouygues TelecomSFRFree MobileVerifiedEstimated

Carrier breakdown

OperatorSitesShare
Orange480.0%
Bouygues Telecom360.0%
SFR360.0%
Free Mobile120.0%

Declared locations include Les Garennes de Sainte Neo, place Francois Quesnay, Les Bas de Guerches, Les Grande Rentes and Les Groies Tord.

Inventory: a 30 m pylon, at Les Garennes de Sainte Neo, for Orange; a 38 m pylon, at place Francois Quesnay, for Bouygues Telecom, Free Mobile, Orange and SFR; a 30 m pylon, at Les Bas de Guerches, for Bouygues Telecom and SFR; a 30 m pylon, at Les Grande Rentes, for Bouygues Telecom, Orange and SFR; a 36 m pylon, at Les Groies Tord, for Orange.

ANFR has approved one new site that is not live yet, plus additions on one existing mast. New: Free Mobile (4G and 5G, including 5G at 3.5 GHz) at Le Bois Juge. 5 Bouygues Telecom 5G transmitters are listed as technically operational — installed, but not yet declared commercially in service.

No mast is operator-owned: TDF has 2, Hivory has 1 and Phoenix France Infrastructures has 1.

3.5 GHz 5G is declared by Orange on 3 of its 4 masts, Bouygues Telecom on 2 of its 3 masts and SFR on 2 of its 3 masts. Free Mobile only has 5G on 700 MHz — longer reach, lower speed.

2022 was the busiest year, with 25 new systems, most of them 4G. Local 5G started with SFR in October 2022; Bouygues Telecom followed in November 2022, Orange followed in November 2023. The oldest transmitter still listed here goes back to 2008.

The tallest structure is a 38 m pylon at place Francois Quesnay. The median height of measured supports is 30 m.

By mast count, La Creche is 11th of the 12 Deux-Sèvres towns that have five or more. With 5 masts for 5,662 residents, or 9 per 10,000, it has fewer masts per inhabitant than the median for those towns (12).

6 km to the west, neighbouring Chauray has 8 masts, more than here.

Supports leave a gap of about 3.1 km to the north-west of the centre.

Of the 5 masts in the commune, only one mast carries all four networks.

Source: operator declarations to ANFR, as of October 2026. Projects that are only approved are left out of the totals.

Frequently asked questions

Are new antennas planned in La Creche?
ANFR has approved one new site that is not live yet, plus additions on one existing mast. New: Free Mobile (4G and 5G, including 5G at 3.5 GHz) at Le Bois Juge.
Who holds the antenna sites in La Creche?
No mast is operator-owned: TDF has 2, Hivory has 1 and Phoenix France Infrastructures has 1.
Who broadcasts 3.5 GHz in La Creche?
3.5 GHz 5G is declared by Orange on 3 of its 4 masts, Bouygues Telecom on 2 of its 3 masts and SFR on 2 of its 3 masts. Band details in the 5G-by-carrier guide.
When did 5G arrive in La Creche?
SFR declared the first 5G in October 2022, Bouygues Telecom in November 2022.
Where is the tallest mast in La Creche?
The tallest declared support is 38 m at place Francois Quesnay (pylon).

Nearby places

Useful guides

Data source: ANFR — Licence Ouverte 2.0. See all sources.