Cell Site Map

Cell towers in Thure (Vienne)

4 carriers share the 5 masts that ANFR lists in Thure. SFR was the first to declare 5G here, in 2022.

Nearest sites

OperatorGenerationDistanceBearingSource
Orange5G / 4G / 3G · 3 sectors597 m200° SVerified
SFR5G / 4G / 3G / 2G · 3 sectors1.1 km257° WVerified
Free Mobile5G / 4G · 3 sectors1.1 km257° WVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors1.1 km257° WVerified
SFR5G / 4G / 3G / 2G · 3 sectors1.8 km31° NEVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors1.8 km31° NEVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors3.6 km109° EVerified
SFR5G / 4G / 3G / 2G · 3 sectors3.6 km109° EVerified

Map

Bouygues TelecomSFRFree MobileOrangeVerifiedEstimated

Carrier breakdown

OperatorSitesShare
Bouygues Telecom360.0%
SFR360.0%
Free Mobile240.0%
Orange240.0%

Place names on the register include Clos de la Pelletrie, Le Parc du Chateau, Les Champs, Les Communeaux and L'Ourdière.

Inventory: a 32 m pylon, at Clos de la Pelletrie, for Bouygues Telecom and SFR; a 22 m pylon, at Le Parc du Chateau, for Orange; a 32 m pylon, at Les Champs, for Bouygues Telecom, Free Mobile and SFR; a 29 m pylon, at Les Communeaux, for Bouygues Telecom, Free Mobile and SFR; a 25 m pylon, at L'Ourdière, for Orange.

3.5 GHz 5G is declared by Bouygues Telecom on 1 of its 3 masts, Orange on 1 of its 2 masts and SFR on 1 of its 3 masts. Free Mobile only has 5G on 700 MHz — longer reach, lower speed.

2022 was the busiest year, with 17 new systems, most of them 4G. SFR switched on the first 5G here in January 2022; Bouygues Telecom followed in March 2022, Orange followed in January 2025. The oldest transmitter still listed here goes back to 2001.

Approved additions not yet in service are pending on one existing mast, for example Free Mobile (4G and 5G) at Les Champs. 4 Bouygues Telecom 5G transmitters are listed as technically operational — installed, but not yet declared commercially in service.

ANFR lists a 32 m pylon at Clos de la Pelletrie as the tallest structure. The median height of measured supports is 29 m.

By mast count, Thure is 12th of the 12 Vienne towns that have five or more. With 5 masts for 2,765 residents, or 18 per 10,000, it has fewer masts per inhabitant than the median for those towns (19).

Supports leave a gap of about 2.5 km to the north-west of the centre. Most declared azimuths point outward, along a corridor or valley rather than at the centre.

25 km to the south-west, neighbouring Migne has a water tower among its supports.

Of the 5 masts in the commune, 3 of the 5 masts host at least two operators.

Source: operator declarations to ANFR, as of October 2026. Projects that are only approved are left out of the totals.

Frequently asked questions

Is fast 5G declared in Thure?
3.5 GHz 5G is declared by Bouygues Telecom on 1 of its 3 masts, Orange on 1 of its 2 masts and SFR on 1 of its 3 masts. Band details in the 5G-by-carrier guide.
When did 5G arrive in Thure?
SFR declared the first 5G in January 2022, Bouygues Telecom in March 2022.
Are new antennas planned in Thure?
No new site is approved at the moment. Approved additions not yet in service are pending on one existing mast, for example Free Mobile (4G and 5G) at Les Champs.
Where is the tallest mast in Thure?
The tallest declared support is 32 m at Clos de la Pelletrie (pylon).
How does Thure compare with other Vienne towns?
By mast count, Thure is 12th of the 12 Vienne towns that have five or more. With 5 masts for 2,765 residents, or 18 per 10,000, it has fewer masts per inhabitant than the median for those towns (19).

Nearby places

Useful guides

Data source: ANFR — Licence Ouverte 2.0. See all sources.