Cell Site Map

Cell towers in Graveson (Bouches-du-Rhône)

3 carriers share the 6 masts that ANFR lists in Graveson. ANFR has also approved one new site that is not live yet.

Nearest sites

OperatorGenerationDistanceBearingSource
Bouygues Telecom4G / 3G · 3 sectors568 m351° NVerified
SFR4G / 3G / 2G · 3 sectors588 m342° NVerified
Orange5G / 4G · 3 sectors651 m254° WVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors847 m217° SWVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors1.3 km185° SVerified
Orange5G / 4G · 3 sectors1.3 km185° SVerified
Orange5G / 4G / 3G · 2 sectors1.3 km278° WVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors1.4 km65° NEVerified
Free Mobile5G / 4G · 3 sectors1.4 km65° NEVerified
Free Mobile5G / 4G · 3 sectors1.4 km180° SVerified

Map

SFROrangeBouygues TelecomVerifiedEstimated

Carrier breakdown

OperatorSitesShare
SFR233.3%
Orange233.3%
Bouygues Telecom233.3%

Place names on the register include La Montagnette - la Juverte, Tirequieu et Gayanne, 168 Route de Chateaurenard, Le Bois, Stade and Chemin de la Roulade.

Inventory: a 12 m pylon, at La Montagnette - la Juverte, for SFR; a 20 m pylon, at Tirequieu et Gayanne, for Orange; a 24 m pylon, at 168 Route de Chateaurenard, for Orange; a 27 m pylon, at Le Bois, for Bouygues Telecom; a 27 m pylon, at Stade, for Bouygues Telecom; a 20 m pylon, at Chemin de la Roulade, for SFR.

ANFR has approved one new site that is not live yet. New: Free Mobile (4G and 5G, including 5G at 3.5 GHz) at Redonneau. 2 Bouygues Telecom 5G transmitters are listed as technically operational — installed, but not yet declared commercially in service.

2021 was the busiest year, with 14 new systems, most of them 4G. Local 5G started with SFR in June 2021; Orange followed in April 2022, Bouygues Telecom followed in December 2022. The oldest transmitter still listed here goes back to 1998.

The tallest structure is a 27 m pylon at Stade. The median height of measured supports is 22 m.

3.5 GHz 5G is declared by Orange on all 2 masts, Bouygues Telecom on 1 of its 2 masts and SFR on 1 of its 2 masts.

5.8 km to the north, neighbouring Barbentane has 6 masts declared.

By mast count, Graveson is 73rd of the 92 Bouches-du-Rhône towns that have five or more.

Source: operator declarations to ANFR, as of October 2026. Projects that are only approved are left out of the totals.

Frequently asked questions

Are new antennas planned in Graveson?
ANFR has approved one new site that is not live yet. New: Free Mobile (4G and 5G, including 5G at 3.5 GHz) at Redonneau.
When did 5G arrive in Graveson?
SFR declared the first 5G in June 2021, Orange in April 2022.
Where is the tallest mast in Graveson?
The tallest declared support is 27 m at Stade (pylon).
Which carriers have 3.5 GHz 5G in Graveson?
3.5 GHz 5G is declared by Orange on all 2 masts, Bouygues Telecom on 1 of its 2 masts and SFR on 1 of its 2 masts. Band details in the 5G-by-carrier guide.
How does Graveson compare with other Bouches-du-Rhône towns?
By mast count, Graveson is 73rd of the 92 Bouches-du-Rhône towns that have five or more.

Nearby places

Useful guides

Data source: ANFR — Licence Ouverte 2.0. See all sources.