Evron has 8 masts declared to ANFR, used by 4 carriers. They include 1 water tower.

Nearest sites

OperatorGenerationDistanceBearingSource
Orange5G / 4G / 3G · 3 sectors432 m7° NVerified
Free Mobile5G / 4G · 3 sectors432 m7° NVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors1.1 km345° NVerified
SFR5G / 4G / 3G / 2G · 3 sectors1.1 km345° NVerified
Free Mobile5G / 4G · 3 sectors1.1 km120° SEVerified
Free Mobile5G / 4G · 3 sectors1.4 km232° SWVerified
Orange4G / 3G · 3 sectors1.4 km232° SWVerified
Orange5G / 4G / 3G · 3 sectors1.5 km131° SEVerified
Bouygues Telecom5G / 4G / 3G · 3 sectors1.7 km208° SWVerified
SFR5G / 4G / 3G · 3 sectors1.7 km208° SWVerified

Map

OrangeFree MobileBouygues TelecomSFRVerifiedEstimated

Carrier breakdown

OperatorSitesShare
Orange562.5%
Free Mobile450.0%
Bouygues Telecom337.5%
SFR337.5%

Declared supports include 1 water tower, with pylons making up most of the remainder.

Antennas are listed at La Maison Rouge Evron, La Saulaie, Route de Voutré, ZI des Maltières, Le Bois Gaudin and 20 Avenue Raoul Vadepied.

ANFR lists a 42 m pylon at ZI des Maltières as the tallest structure. The median height of measured supports is 34 m.

Systems from 2009 are still on the register. Local 5G started with Free Mobile in January 2021; Bouygues Telecom followed in July 2023, SFR followed in August 2023. 2023 was the busiest year, with 20 new systems, most of them 4G.

Over the past 12 months ANFR recorded 15 new systems here. Approved additions not yet in service are pending on 2 existing masts, for example Bouygues Telecom (4G and 5G) at Le Bois Gaudin and Orange (4G and 5G) at La Saulaie. 4 Bouygues Telecom 5G transmitters are listed as technically operational — installed, but not yet declared commercially in service.

4 masts belong to Totem and 1 to On Tower France.

On 3.5 GHz, the fastest 5G band: Bouygues Telecom on 2 of its 3 masts, Free Mobile on 2 of its 4 masts, Orange on 2 of its 5 masts and SFR on 2 of its 3 masts.

The widest declared gap between neighbouring supports is about 4.1 km, to the west of the centre.

24 km to the west, neighbouring Louverne has 6 masts declared.

Colocation covers 6 supports.

8,252 residents over 69 km²: supports are mostly pylons, not rooftops.

Figures above cover installations declared to ANFR as in service or technically operational, as of October 2026; approved projects are not counted.

Frequently asked questions

What do the masts in Evron stand on?
Declared supports include 1 water tower, with pylons making up most of the remainder.
Where is the tallest mast in Evron?
The tallest declared support is 42 m at ZI des Maltières (pylon).
When did 5G arrive in Evron?
Free Mobile declared the first 5G in January 2021, Bouygues Telecom in July 2023.
Are new antennas planned in Evron?
No new site is approved at the moment. Approved additions not yet in service are pending on 2 existing masts, for example Bouygues Telecom (4G and 5G) at Le Bois Gaudin and Orange (4G and 5G) at La Saulaie.
Are there antennas on public buildings in Evron?
1 mast is declared as belonging to a public body.