Cell Site Map

Cell towers in Rodez (Aveyron)

ANFR lists 15 masts in Rodez, shared between 4 carriers. Free Mobile was the first to declare 5G here, in 2020.

Nearest sites

OperatorGenerationDistanceBearingSource
Orange5G / 4G / 3G · 3 sectors214 m302° NWVerified
SFR4G / 3G / 2G · 2 sectors289 m79° EVerified
Bouygues Telecom4G / 3G / 2G · 2 sectors289 m79° EVerified
Orange4G / 3G · 3 sectors322 m143° SEVerified
Bouygues Telecom4G / 3G / 2G · 3 sectors322 m143° SEVerified
SFR4G / 3G / 2G · 3 sectors322 m143° SEVerified
Free Mobile5G / 4G · 3 sectors322 m143° SEVerified
Orange5G / 4G · 1 sectors400 m151° SEVerified
SFR4G / 3G / 2G · 3 sectors437 m160° SVerified
Bouygues Telecom4G / 3G / 2G · 3 sectors437 m160° SVerified

Map

OrangeBouygues TelecomSFRFree MobileVerifiedEstimated

Carrier breakdown

OperatorSitesShare
Orange960.0%
Bouygues Telecom640.0%
SFR640.0%
Free Mobile533.3%

Masts stand at Rue Eugène Viala, Bel Air, 3 Pl. de l'Olmet, 21 rue Raynal, 4 - 6 - 8 avenue de Paris and Rue des Charpentiers.

Systems from 1999 are still on the register. Free Mobile opened 5G here in December 2020; SFR followed in August 2021, Bouygues Telecom followed in August 2021. 2017 was the busiest year, with 33 new systems, most of them 4G.

Approved additions not yet in service are pending on 2 existing masts, for example Bouygues Telecom (4G and 5G, including 5G at 3.5 GHz) at 25 rue Neuve, Bouygues Telecom (4G and 5G, including 5G at 3.5 GHz) at Rue Eugène Viala and Orange (5G, including 5G at 3.5 GHz) at 25 rue Neuve. 4 Bouygues Telecom 5G transmitters are listed as technically operational — installed, but not yet declared commercially in service.

Most antennas sit on rooftops (10 of 15), so heights stay modest; the tallest support is 44 m at rue Eugène Loup.

Only one mast carries all four networks; 6 supports carry only Orange.

Among the 8 Aveyron towns with at least five masts, Rodez ranks 2nd by mast count. With 15 masts for 23,981 residents, or 6 per 10,000, it has fewer masts per inhabitant than the median for those towns (11).

On 3.5 GHz, the fastest 5G band: Orange on 8 of its 9 masts, Free Mobile on all 5 masts, Bouygues Telecom on 2 of its 6 masts and SFR on 2 of its 6 masts.

24 km to the north-east, neighbouring Espalion has only 5 masts.

Most declared azimuths point outward, along a corridor or valley rather than at the centre.

At 11 km² with 23,981 residents, the commune is dense enough that most antennas sit on rooftops rather than pylons. It is part of the CA Rodez Agglomération intercommunal grouping.

10 buildings and 3 pylons, 1 radio relay tower and 1 mast carry the commune's antennas.

Figures above cover installations declared to ANFR as in service or technically operational, as of October 2026; approved projects are not counted.

Frequently asked questions

When did 5G arrive in Rodez?
Free Mobile declared the first 5G in December 2020, SFR in August 2021.
Are new antennas planned in Rodez?
No new site is approved at the moment. Approved additions not yet in service are pending on 2 existing masts, for example Bouygues Telecom (4G and 5G, including 5G at 3.5 GHz) at 25 rue Neuve, Bouygues Telecom (4G and 5G, including 5G at 3.5 GHz) at Rue Eugène Viala and Orange (5G, including 5G at 3.5 GHz) at 25 rue Neuve.
Where is the tallest mast in Rodez?
The tallest declared support is 44 m at rue Eugène Loup (radio relay tower).
Which carrier has the most sites of its own in Rodez?
Orange is on its own at 6 locations.
How does Rodez compare with other Aveyron towns?
Among the 8 Aveyron towns with at least five masts, Rodez ranks 2nd by mast count. With 15 masts for 23,981 residents, or 6 per 10,000, it has fewer masts per inhabitant than the median for those towns (11).

Nearby places

Useful guides

Data source: ANFR — Licence Ouverte 2.0. See all sources.