Cell towers in Font-Romeu-Odeillo-Via

ANFR lists 8 masts in Font-Romeu-Odeillo-Via, shared between 4 carriers. Free Mobile was the first to declare 5G here, in 2022.

Nearest sites

OperatorGenerationDistanceBearingSource
Orange5G / 4G / 3G / 2G · 3 sectors248 m223° SWVerified
Orange5G / 4G / 3G · 2 sectors892 m106° EVerified
Orange5G / 4G · 3 sectors1.6 km8° NVerified
Orange5G / 4G / 3G · 3 sectors1.8 km65° NEVerified
Free Mobile5G / 4G · 3 sectors2 km192° SVerified
SFR4G / 3G / 2G · 3 sectors2.5 km27° NEVerified
Bouygues Telecom4G / 3G / 2G · 3 sectors2.5 km27° NEVerified
Orange4G / 3G · 3 sectors2.5 km27° NEVerified
Free Mobile5G / 4G · 3 sectors2.5 km27° NEVerified
Orange4G · 3 sectors2.6 km250° WVerified

Map

OrangeBouygues TelecomSFRFree MobileVerifiedEstimated

Carrier breakdown

OperatorSitesShare
Orange562.5%
Bouygues Telecom225.0%
SFR225.0%
Free Mobile225.0%

Masts stand at Serrat de l'Os, Les Boigues, Roc de la Calma, 9 Rue des Narcisses and Serra Dels Fornells.

On 3.5 GHz, the fastest 5G band: Orange on 3 of its 5 masts and Free Mobile on all 2 masts.

Systems from 1998 are still on the register. Free Mobile opened 5G here in January 2022; Orange followed in December 2022, SFR followed in December 2024. 2017 was the busiest year, with 14 new systems, most of them 4G.

Approved additions not yet in service are pending on 3 existing masts, for example Free Mobile (4G and 5G) at Roc de la Calma, Free Mobile (4G and 5G, including 5G at 3.5 GHz) at Les Boigues and Orange (5G, including 5G at 3.5 GHz) at Serrat de l'Os. 1 Bouygues Telecom 5G transmitter is listed as technically operational — installed, but not yet declared commercially in service.

ANFR lists a 31 m pylon at 9 Rue des Narcisses as the tallest structure. The median height of measured supports is 24 m.

4 supports carry only Orange.

Among the 18 Pyrénées-Orientales towns with at least five masts, Font-Romeu-Odeillo-Via ranks 7th by mast count.

Ax-les-Thermes lies 29 km to the north-west and has less 5G (75%).

The widest declared gap between neighbouring supports is about 1.8 km, to the south of the centre.

1,762 residents over 30 km²: supports are mostly pylons, not rooftops.

Supports split between 7 pylons and 1 building.

Figures above cover installations declared to ANFR as in service or technically operational, as of October 2026; approved projects are not counted.

Frequently asked questions

Is fast 5G declared in Font-Romeu-Odeillo-Via?
3.5 GHz 5G is declared by Orange on 3 of its 5 masts and Free Mobile on all 2 masts. Band details in the 5G-by-carrier guide.
When did 5G arrive in Font-Romeu-Odeillo-Via?
Free Mobile declared the first 5G in January 2022, Orange in December 2022.
Are new antennas planned in Font-Romeu-Odeillo-Via?
No new site is approved at the moment. Approved additions not yet in service are pending on 3 existing masts, for example Free Mobile (4G and 5G) at Roc de la Calma, Free Mobile (4G and 5G, including 5G at 3.5 GHz) at Les Boigues and Orange (5G, including 5G at 3.5 GHz) at Serrat de l'Os.
Where is the tallest mast in Font-Romeu-Odeillo-Via?
The tallest declared support is 31 m at 9 Rue des Narcisses (pylon).
Which carrier has the most sites of its own in Font-Romeu-Odeillo-Via?
Orange is on its own at 4 locations.

Nearby places

Useful guides

Data source: ANFR — Licence Ouverte 2.0. See all sources.