Cell Site Map

Cell towers in Giberville (Calvados)

ANFR lists 5 masts in Giberville, shared between 4 carriers. Orange was the first to declare 5G here, in 2021.

Nearest sites

OperatorGenerationDistanceBearingSource
SFR5G / 4G · 3 sectors547 m182° SVerified
Bouygues Telecom5G / 4G · 3 sectors547 m182° SVerified
Orange5G / 4G / 3G · 3 sectors944 m326° NWVerified
Free Mobile5G / 4G · 3 sectors1 km320° NWVerified
Free Mobile5G / 4G · 3 sectors1.1 km198° SVerified
Orange5G / 4G / 3G · 3 sectors1.2 km194° SVerified
Orange5G / 4G / 3G · 3 sectors1.2 km36° NEVerified
Free Mobile5G / 4G · 3 sectors1.6 km14° NVerified
SFR5G / 4G / 3G / 2G · 3 sectors1.6 km14° NVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors1.6 km14° NVerified

Map

OrangeFree MobileBouygues TelecomSFRVerifiedEstimated

Carrier breakdown

OperatorSitesShare
Orange240.0%
Free Mobile240.0%
Bouygues Telecom120.0%
SFR120.0%

Declared locations include rue de l' Industrie, Piece de la Grand Route, La Grue, 57 Rue de la Liberte and 42 B Rue du Centre.

Inventory: a 27 m pylon, at rue de l' Industrie, for Orange; a 32 m pylon, at Piece de la Grand Route, for Free Mobile; a 31 m pylon, at La Grue, for Orange; a 32 m pylon, at 57 Rue de la Liberte, for Free Mobile; a 30 m pylon, at 42 B Rue du Centre, for Bouygues Telecom and SFR.

3.5 GHz 5G is declared by Free Mobile on all 2 masts and Orange on all 2 masts. 100% of the town's masts carry 5G, more than across Calvados towns with five or more masts (88%).

2025 was the busiest year, with 15 new systems, most of them 4G. Orange switched on the first 5G here in June 2021; Free Mobile followed in November 2024, Bouygues Telecom followed in November 2025.

11 systems were switched on in the past 12 months. Approved additions not yet in service are pending on 2 existing masts, for example Free Mobile (5G 700 MHz) at Piece de la Grand Route and SFR (3G 900 MHz) at 42 B Rue du Centre. 1 Bouygues Telecom 5G transmitter is listed as technically operational — installed, but not yet declared commercially in service.

The highest support stands 32 m at 57 Rue de la Liberte (pylon). The median height of measured supports is 31 m.

By mast count, Giberville is 20th of the 20 Calvados towns that have five or more. With 5 masts for 5,077 residents, or 10 per 10,000, it has more masts per inhabitant than the median for those towns (9).

Totem is the largest declared owner (2 masts), ahead of Cellnex (1).

Colombelles lies 2.7 km to the north and has 7 masts declared.

Source: operator declarations to ANFR, as of October 2026. Projects that are only approved are left out of the totals.

Frequently asked questions

Who broadcasts 3.5 GHz in Giberville?
3.5 GHz 5G is declared by Free Mobile on all 2 masts and Orange on all 2 masts. Band details in the 5G-by-carrier guide.
When did 5G arrive in Giberville?
Orange declared the first 5G in June 2021, Free Mobile in November 2024.
Are new antennas planned in Giberville?
No new site is approved at the moment. Approved additions not yet in service are pending on 2 existing masts, for example Free Mobile (5G 700 MHz) at Piece de la Grand Route and SFR (3G 900 MHz) at 42 B Rue du Centre.
Where is the tallest mast in Giberville?
The tallest declared support is 32 m at 57 Rue de la Liberte (pylon).
How does Giberville compare with other Calvados towns?
By mast count, Giberville is 20th of the 20 Calvados towns that have five or more. With 5 masts for 5,077 residents, or 10 per 10,000, it has more masts per inhabitant than the median for those towns (9).

Nearby places

Useful guides

Data source: ANFR — Licence Ouverte 2.0. See all sources.