Cell Site Map

Cell towers in Paris 03 Temple (Paris)

4 carriers share the 39 masts that ANFR lists in Paris 03 Temple. They include 7 underground or tunnel sites.

Nearest sites

OperatorGenerationDistanceBearingSource
Bouygues Telecom5G / 4G / 3G · 3 sectors72 m287° WVerified
Free Mobile5G / 4G · 2 sectors72 m287° WVerified
Orange4G · 1 sectors172 m33° NEVerified
Orange5G / 4G / 3G / 2G · 3 sectors233 m235° SWVerified
SFR5G / 4G / 3G · 3 sectors233 m235° SWVerified
Bouygues Telecom5G / 4G · 3 sectors237 m92° EVerified
Orange4G / 3G · 3 sectors268 m358° NVerified
Orange5G / 4G / 3G / 2G · 3 sectors271 m127° SEVerified
Free Mobile5G / 4G · 3 sectors288 m182° SVerified
Bouygues Telecom5G / 4G · 3 sectors305 m286° WVerified

Map

Free MobileBouygues TelecomOrangeSFRVerifiedEstimated

Carrier breakdown

OperatorSitesShare
Free Mobile1435.9%
Bouygues Telecom1230.8%
Orange1128.2%
SFR1025.6%

7 supports are declared underground, in a gallery or a tunnel. For questions about exposure, see the exposure guide.

Declared supports include 7 underground or tunnel sites, with buildings making up most of the remainder.

Place names on the register include Métro Republique L3 L5 L11, Metro Chemin Vert L8, Métro Republique L8 L9, Metro_republique_l8_l9, 327 rue St Martin and Metro Republique L8.

15 systems were switched on in the past 12 months. ANFR has approved 2 new sites that are not live yet, plus additions on 13 existing masts. New: Free Mobile (4G) at Metro_arts et Metiers_l3_l11 and SFR (4G and 5G, including 5G at 3.5 GHz). 14 Bouygues Telecom 5G transmitters are listed as technically operational — installed, but not yet declared commercially in service.

2014 was the busiest year, with 47 new systems, most of them 4G. Bouygues Telecom switched on the first 5G here in January 2021; Orange followed in March 2021, SFR followed in March 2021. The oldest transmitter still listed here goes back to 1996.

32 of the 39 masts are rooftop-mounted. The tallest support is 55 m at 61 rue des Archives (building). The median height of measured supports is 28 m.

By mast count, Paris 03 Temple is 21st of the 21 Paris towns that have five or more.

3.5 GHz 5G is declared by Free Mobile on 8 of its 14 masts, Bouygues Telecom on 6 of its 12 masts, Orange on 5 of its 11 masts and SFR on 5 of its 10 masts. 54% of the town's masts carry 5G, fewer than across Paris towns with five or more masts (66%).

1.5 km to the south-west, neighbouring Paris has 2,436 masts, more than here.

At 1 km² with 32,179 residents, the commune is dense enough that most antennas sit on rooftops rather than pylons.

Source: operator declarations to ANFR, as of October 2026. Projects that are only approved are left out of the totals.

Frequently asked questions

What do the masts in Paris 03 Temple stand on?
Declared supports include 7 underground or tunnel sites, with buildings making up most of the remainder.
Are new antennas planned in Paris 03 Temple?
ANFR has approved 2 new sites that are not live yet, plus additions on 13 existing masts. New: Free Mobile (4G) at Metro_arts et Metiers_l3_l11 and SFR (4G and 5G, including 5G at 3.5 GHz).
When did 5G arrive in Paris 03 Temple?
Bouygues Telecom declared the first 5G in January 2021, Orange in March 2021.
Where is the tallest mast in Paris 03 Temple?
The tallest declared support is 55 m at 61 rue des Archives (building).
How does Paris 03 Temple compare with other Paris towns?
By mast count, Paris 03 Temple is 21st of the 21 Paris towns that have five or more.

Nearby places

Useful guides

Data source: ANFR — Licence Ouverte 2.0. See all sources.