Cell Site Map

Cell towers in Noisiel (Seine-et-Marne)

4 carriers share the 7 masts that ANFR lists in Noisiel. They include 1 underground or tunnel site and 1 water tower.

Nearest sites

OperatorGenerationDistanceBearingSource
SFR5G / 4G / 3G / 2G · 3 sectors384 m322° NWVerified
Free Mobile5G / 4G · 3 sectors666 m54° NEVerified
SFR5G / 4G / 3G / 2G · 3 sectors669 m264° WVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors669 m264° WVerified
Orange5G / 4G · 3 sectors685 m52° NEVerified
SFR5G / 4G / 3G · 3 sectors685 m52° NEVerified
Free Mobile5G / 4G · 3 sectors818 m232° SWVerified
Orange4G / 3G · 3 sectors818 m232° SWVerified
Bouygues Telecom5G / 4G / 3G · 3 sectors829 m221° SWVerified
Free Mobile5G / 4G · 3 sectors832 m265° WVerified

Map

SFRBouygues TelecomFree MobileOrangeVerifiedEstimated

Carrier breakdown

OperatorSitesShare
SFR457.1%
Bouygues Telecom342.9%
Free Mobile342.9%
Orange228.6%

1 support is declared underground, in a gallery or a tunnel. For questions about exposure, see the exposure guide.

Declared supports include 1 underground or tunnel site and 1 water tower, with buildings making up most of the remainder.

Masts stand at Bois de la Grange-Lognes, La Ferme du Buisson, 9 Cours des Deux Parcs, 2 Grande Allee Leon Blum Accord Cadre Antin, Gare Rer Noisiel and Rond Point des 4 Paves.

ANFR has approved one new site that is not live yet, plus additions on one existing mast. New: SFR (3G, 4G and 5G, including 5G at 3.5 GHz) at 6 Allee Buissonniere. 4 Bouygues Telecom 5G transmitters are listed as technically operational — installed, but not yet declared commercially in service.

Systems from 1997 are still on the register. Bouygues Telecom switched on the first 5G here in November 2020; SFR followed in December 2020, Free Mobile followed in December 2020. 2016 was the busiest year, with 13 new systems, most of them 4G.

The tallest structure is a 50 m building at 9 Cours des Deux Parcs. The median height of measured supports is 32 m.

On 3.5 GHz, the fastest 5G band: SFR on 3 of its 4 masts, Free Mobile on 2 of its 3 masts and Bouygues Telecom on 1 of its 3 masts.

Lognes lies 1.5 km to the south and has a higher 5G share (100%).

Only one mast carries all four networks.

At 4 km² with 16,053 residents, the commune is dense enough that most antennas sit on rooftops rather than pylons.

Figures above cover installations declared to ANFR as in service or technically operational, as of October 2026; approved projects are not counted.

Frequently asked questions

What do the masts in Noisiel stand on?
Declared supports include 1 underground or tunnel site and 1 water tower, with buildings making up most of the remainder.
Are new antennas planned in Noisiel?
ANFR has approved one new site that is not live yet, plus additions on one existing mast. New: SFR (3G, 4G and 5G, including 5G at 3.5 GHz) at 6 Allee Buissonniere.
When did 5G arrive in Noisiel?
Bouygues Telecom declared the first 5G in November 2020, SFR in December 2020.
Where is the tallest mast in Noisiel?
The tallest declared support is 50 m at 9 Cours des Deux Parcs (building).
Is fast 5G declared in Noisiel?
3.5 GHz 5G is declared by SFR on 3 of its 4 masts, Free Mobile on 2 of its 3 masts and Bouygues Telecom on 1 of its 3 masts. Band details in the 5G-by-carrier guide.

Nearby places

Useful guides

Data source: ANFR — Licence Ouverte 2.0. See all sources.