Cell Site Map

Cell towers in L'Hay-les-Roses (Val-de-Marne)

L'Hay-les-Roses has 20 masts declared to ANFR, used by 4 carriers. They include 3 road gantries and 1 church or religious building.

Nearest sites

OperatorGenerationDistanceBearingSource
Free Mobile5G / 4G · 3 sectors26 m143° SEVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors44 m20° NVerified
SFR5G / 4G / 3G / 2G · 3 sectors164 m309° NWVerified
Orange5G / 4G / 3G · 3 sectors164 m309° NWVerified
SFR5G / 4G / 3G / 2G · 3 sectors477 m112° EVerified
Free Mobile5G / 4G · 3 sectors477 m112° EVerified
Orange4G / 3G · 3 sectors613 m107° EVerified
SFR4G / 3G / 2G · 2 sectors650 m95° EVerified
Bouygues Telecom5G / 4G / 3G · 3 sectors834 m260° WVerified
SFR4G / 3G · 3 sectors840 m209° SWVerified

Map

Bouygues TelecomFree MobileOrangeSFRVerifiedEstimated

Carrier breakdown

OperatorSitesShare
Bouygues Telecom945.0%
Free Mobile840.0%
Orange735.0%
SFR525.0%

1 support is declared underground, in a gallery or a tunnel. For questions about exposure, see the exposure guide.

Most of the town's 20 masts are buildings (14); 3 road gantries, 1 church or religious building and 1 underground or tunnel site make up the rest of the mix.

Declared locations include 18 Rue Henri Thirard, Métro l'Hay les Roses L17, 2 rue Leon Blum (la Vall des Renards Rpa), Les Blondeaux, 1-3 allée Pierre Mendes-France and 22 Rue Gustave Charpentier.

23 systems were switched on in the past 12 months. ANFR has approved one new site that is not live yet, plus additions on 6 existing masts. New: Bouygues Telecom (4G and 5G, including 5G at 3.5 GHz) at 3 Allée des Pervenches. 14 Bouygues Telecom 5G transmitters are listed as technically operational — installed, but not yet declared commercially in service.

The commune owns 2 of the 20 masts, Cellnex owns 1.

2018 was the busiest year, with 53 new systems, most of them 4G. Local 5G started with Bouygues Telecom in November 2020; Orange followed in December 2020, Free Mobile followed in December 2020. The oldest transmitter still listed here goes back to 1997.

14 of the 20 masts are rooftop-mounted. The tallest support is 56 m at 8 rue Gustave Charpentier (building). The median is 21 m, slightly below the Val-de-Marne median of 25 m.

3.5 GHz 5G is declared by Bouygues Telecom on 7 of its 9 masts, Free Mobile on 7 of its 8 masts, Orange on 4 of its 7 masts and SFR on 3 of its 5 masts.

Nearby, Bourg-la-Reine (1.4 km to the west) has only 10 masts.

Of the 20 masts in the commune, only one mast carries all four networks.

At 4 km² with 31,188 residents, the commune is dense enough that most antennas sit on rooftops rather than pylons. It is part of the Métropole du Grand Paris intercommunal grouping.

Source: operator declarations to ANFR, as of October 2026. Projects that are only approved are left out of the totals.

Frequently asked questions

What do the masts in L'Hay-les-Roses stand on?
Most of the town's 20 masts are buildings (14); 3 road gantries, 1 church or religious building and 1 underground or tunnel site make up the rest of the mix.
Are new antennas planned in L'Hay-les-Roses?
ANFR has approved one new site that is not live yet, plus additions on 6 existing masts. New: Bouygues Telecom (4G and 5G, including 5G at 3.5 GHz) at 3 Allée des Pervenches.
Are there antennas on public buildings in L'Hay-les-Roses?
2 masts are declared as belonging to a public body.
When did 5G arrive in L'Hay-les-Roses?
Bouygues Telecom declared the first 5G in November 2020, Orange in December 2020.
Where is the tallest mast in L'Hay-les-Roses?
The tallest declared support is 56 m at 8 rue Gustave Charpentier (building).

Nearby places

Useful guides

Data source: ANFR — Licence Ouverte 2.0. See all sources.