Cell Site Map

Cell towers in Guines (Pas-de-Calais)

4 carriers share the 5 masts that ANFR lists in Guines. Free Mobile was the first to declare 5G here, in 2021.

Nearest sites

OperatorGenerationDistanceBearingSource
Orange5G / 4G / 3G / 2G · 3 sectors366 m287° WVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors409 m272° WVerified
Free Mobile5G / 4G · 3 sectors409 m272° WVerified
SFR5G / 4G / 3G / 2G · 3 sectors409 m272° WVerified
Free Mobile4G · 2 sectors2.3 km203° SWVerified
SFR5G / 4G / 3G / 2G · 2 sectors2.3 km185° SVerified
Bouygues Telecom5G / 4G / 3G / 2G · 2 sectors2.3 km185° SVerified
Orange4G / 3G / 2G · 2 sectors2.3 km185° SVerified
Free Mobile5G / 4G · 3 sectors2.8 km277° WVerified
Orange4G / 3G / 2G · 2 sectors2.8 km276° WVerified

Map

Free MobileOrangeBouygues TelecomSFRVerifiedEstimated

Carrier breakdown

OperatorSitesShare
Free Mobile360.0%
Orange360.0%
Bouygues Telecom240.0%
SFR240.0%

Masts stand at Le Banc des Attaques, Chem du Bois de Ballon, 28 rue de Guizelin, Le Moulin aux Corneilles and Impasse Arthur Ledent.

The declared supports are a 31 m pylon, at Le Banc des Attaques, for Free Mobile and Orange; a 25 m pylon, at Chem du Bois de Ballon, for Bouygues Telecom, Orange and SFR; a 33 m building, at 28 rue de Guizelin, for Bouygues Telecom, Free Mobile and SFR; a 32 m pylon, at Le Moulin aux Corneilles, for Free Mobile; a 20 m pylon, at Impasse Arthur Ledent, for Orange.

Systems from 1994 are still on the register. Local 5G started with Free Mobile in September 2021; SFR followed in June 2023, Bouygues Telecom followed in June 2023. 2016 was the busiest year, with 15 new systems, most of them 4G.

Approved additions not yet in service are pending on one existing mast, for example Free Mobile (5G 700 MHz) at Le Moulin aux Corneilles. 3 Bouygues Telecom 5G transmitters are listed as technically operational — installed, but not yet declared commercially in service.

The tallest structure is a 33 m building at 28 rue de Guizelin. The median height of measured supports is 31 m.

The widest declared gap between neighbouring supports is about 3.2 km, to the north-east of the centre. Most declared azimuths point outward, along a corridor or valley rather than at the centre.

On 3.5 GHz, the fastest 5G band: Orange on 2 of its 3 masts, Bouygues Telecom on 1 of its 2 masts, Free Mobile on 1 of its 3 masts and SFR on 1 of its 2 masts.

Nearby, Coulogne (6.4 km to the north) has a higher 5G share (100%).

Colocation covers 3 supports.

Among the 61 Pas-de-Calais towns with at least five masts, Guines ranks 58th by mast count.

Supports split between 4 pylons and 1 building.

Figures above cover installations declared to ANFR as in service or technically operational, as of October 2026; approved projects are not counted.

Frequently asked questions

When did 5G arrive in Guines?
Free Mobile declared the first 5G in September 2021, SFR in June 2023.
Are new antennas planned in Guines?
No new site is approved at the moment. Approved additions not yet in service are pending on one existing mast, for example Free Mobile (5G 700 MHz) at Le Moulin aux Corneilles.
Where is the tallest mast in Guines?
The tallest declared support is 33 m at 28 rue de Guizelin (building).
Which carriers have 3.5 GHz 5G in Guines?
3.5 GHz 5G is declared by Orange on 2 of its 3 masts, Bouygues Telecom on 1 of its 2 masts, Free Mobile on 1 of its 3 masts and SFR on 1 of its 2 masts. Band details in the 5G-by-carrier guide.
Which carrier has the most sites of its own in Guines?
Orange is on its own at 1 location.

Nearby places

Useful guides

Data source: ANFR — Licence Ouverte 2.0. See all sources.