Cell Site Map

Cell towers in Auchy-les-Mines (Pas-de-Calais)

Auchy-les-Mines has 6 masts declared to ANFR, used by 4 carriers. They include 1 water tower.

Nearest sites

OperatorGenerationDistanceBearingSource
Bouygues Telecom5G / 4G / 3G · 3 sectors600 m277° WVerified
Free Mobile5G / 4G · 3 sectors635 m229° SWVerified
SFR5G / 4G / 3G / 2G · 3 sectors635 m229° SWVerified
Orange5G / 4G / 3G / 2G · 3 sectors825 m128° SEVerified
Free Mobile5G / 4G · 3 sectors1.1 km53° NEVerified
Bouygues Telecom5G / 4G / 3G · 3 sectors1.2 km144° SEVerified
Free Mobile5G / 4G · 3 sectors1.3 km110° EVerified
Bouygues Telecom5G / 4G / 3G · 3 sectors1.4 km101° EVerified
SFR5G / 4G / 3G · 3 sectors1.5 km167° SVerified
Bouygues Telecom5G / 4G · 3 sectors1.6 km183° SVerified

Map

Free MobileSFRBouygues TelecomOrangeVerifiedEstimated

Carrier breakdown

OperatorSitesShare
Free Mobile233.3%
SFR233.3%
Bouygues Telecom233.3%
Orange116.7%

Declared supports include 1 water tower, with pylons making up most of the remainder.

Declared locations include Voie Communale N 114 Dite rue de la Ferme des Brique, La Ferme des Briques, rue Ignace Humblot, La Fosse 8, Avenue Nelson Mandela and 320 Chem du Rutoire.

Inventory: a 30 m pylon, at Voie Communale N 114 Dite rue de la Ferme des Brique, for Free Mobile and SFR; a 27 m pylon, at La Ferme des Briques, for Bouygues Telecom; a 50 m water tower, at rue Ignace Humblot, for Orange; a 25 m pylon, at La Fosse 8, for SFR; a 26 m pylon, at Avenue Nelson Mandela, for Free Mobile; a 24 m pylon, at 320 Chem du Rutoire, for Bouygues Telecom.

2022 was the busiest year, with 11 new systems, most of them 4G. Free Mobile switched on the first 5G here in March 2021; Bouygues Telecom followed in October 2022, Orange followed in May 2023. The oldest transmitter still listed here goes back to 1999.

14 systems were switched on in the past 12 months. Approved additions not yet in service are pending on one existing mast, for example Free Mobile (5G 700 MHz) at Avenue Nelson Mandela. 4 Bouygues Telecom 5G transmitters are listed as technically operational — installed, but not yet declared commercially in service.

ANFR lists a 50 m water tower at rue Ignace Humblot as the tallest structure. The median is 26 m, slightly below the Pas-de-Calais median of 30 m.

3.5 GHz 5G is declared by Bouygues Telecom on all 2 masts, SFR on all 2 masts, Free Mobile on 1 of its 2 masts and Orange on its only mast.

Loos-en-Gohelle lies 6.2 km to the south and has less 5G (88%).

Source: operator declarations to ANFR, as of October 2026. Projects that are only approved are left out of the totals.

Frequently asked questions

What do the masts in Auchy-les-Mines stand on?
Declared supports include 1 water tower, with pylons making up most of the remainder.
When did 5G arrive in Auchy-les-Mines?
Free Mobile declared the first 5G in March 2021, Bouygues Telecom in October 2022.
Are new antennas planned in Auchy-les-Mines?
No new site is approved at the moment. Approved additions not yet in service are pending on one existing mast, for example Free Mobile (5G 700 MHz) at Avenue Nelson Mandela.
Where is the tallest mast in Auchy-les-Mines?
The tallest declared support is 50 m at rue Ignace Humblot (water tower).
Who broadcasts 3.5 GHz in Auchy-les-Mines?
3.5 GHz 5G is declared by Bouygues Telecom on all 2 masts, SFR on all 2 masts, Free Mobile on 1 of its 2 masts and Orange on its only mast. Band details in the 5G-by-carrier guide.

Nearby places

Useful guides

Data source: ANFR — Licence Ouverte 2.0. See all sources.