Cell Site Map

Cell towers in Nogent-le-Rotrou (Eure-et-Loir)

Nogent-le-Rotrou has 9 masts declared to ANFR, used by 4 carriers. They include 1 water tower.

Nearest sites

OperatorGenerationDistanceBearingSource
Free Mobile5G / 4G · 3 sectors229 m249° WVerified
Orange5G / 4G / 3G · 3 sectors229 m249° WVerified
SFR5G / 4G / 3G / 2G · 3 sectors733 m264° WVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors733 m264° WVerified
Bouygues Telecom5G / 4G / 3G / 2G · 3 sectors1 km145° SEVerified
SFR5G / 4G / 3G / 2G · 3 sectors1 km145° SEVerified
Orange5G / 4G / 3G / 2G · 3 sectors1.3 km255° WVerified
Free Mobile5G / 4G · 3 sectors1.3 km255° WVerified
Orange5G / 4G / 3G · 3 sectors1.3 km49° NEVerified
Orange5G / 4G / 3G · 3 sectors1.6 km111° EVerified

Map

OrangeBouygues TelecomSFRFree MobileVerifiedEstimated

Carrier breakdown

OperatorSitesShare
Orange555.6%
Bouygues Telecom444.4%
SFR444.4%
Free Mobile444.4%

Declared supports include 1 water tower, with pylons making up most of the remainder.

Place names on the register include Le Petit Gravier, Les Barbaras, 2 Rue Albert Camus, La Butte des Lugères, Haut Bois and Rue de la Bretonnerie.

ANFR lists a 47 m pylon at La Butte des Lugères as the tallest structure. The median height of measured supports is 30 m.

2022 was the busiest year, with 23 new systems, most of them 5G. Free Mobile opened 5G here in December 2020; SFR followed in January 2022, Bouygues Telecom followed in January 2022. The oldest transmitter still listed here goes back to 1995.

17 systems were switched on in the past 12 months. Approved additions not yet in service are pending on 3 existing masts, for example Bouygues Telecom (4G 2600 MHz) at Les Barbaras, Free Mobile (5G 700 MHz) at 6 avenue Georges Clémenceau and Free Mobile (5G 700 MHz) at Rue de la Bretonnerie. 6 Bouygues Telecom 5G transmitters are listed as technically operational — installed, but not yet declared commercially in service.

3.5 GHz 5G is declared by Orange on 3 of its 5 masts, Bouygues Telecom on 2 of its 4 masts, Free Mobile on 2 of its 4 masts and SFR on 2 of its 4 masts.

Nearby, Senonches (31 km to the north-east) has only 6 masts.

Supports leave a gap of about 3.6 km to the west of the centre.

Of the 9 masts in the commune, 8 of the 9 masts host at least two operators.

Source: operator declarations to ANFR, as of October 2026. Projects that are only approved are left out of the totals.

Frequently asked questions

What do the masts in Nogent-le-Rotrou stand on?
Declared supports include 1 water tower, with pylons making up most of the remainder.
Where is the tallest mast in Nogent-le-Rotrou?
The tallest declared support is 47 m at La Butte des Lugères (pylon).
When did 5G arrive in Nogent-le-Rotrou?
Free Mobile declared the first 5G in December 2020, SFR in January 2022.
Are new antennas planned in Nogent-le-Rotrou?
No new site is approved at the moment. Approved additions not yet in service are pending on 3 existing masts, for example Bouygues Telecom (4G 2600 MHz) at Les Barbaras, Free Mobile (5G 700 MHz) at 6 avenue Georges Clémenceau and Free Mobile (5G 700 MHz) at Rue de la Bretonnerie.
Is fast 5G declared in Nogent-le-Rotrou?
3.5 GHz 5G is declared by Orange on 3 of its 5 masts, Bouygues Telecom on 2 of its 4 masts, Free Mobile on 2 of its 4 masts and SFR on 2 of its 4 masts. Band details in the 5G-by-carrier guide.

Nearby places

Useful guides

Data source: ANFR — Licence Ouverte 2.0. See all sources.